Date | : | - |
Status | : | Announcement/Pengumuman |
Date
January 26, 2023
Evaluation result
No | Service Providers | Information |
---|---|---|
1 | PT Ciriajasa Rancangbangun Mandiri | LULUS |
2 | PT Virama Karya | LULUS |
3 | PT Datum Global Mandiri | LULUS |
4 | PT Taram | LULUS |
5 | PT Mitra Pembangunan Jaya | LULUS |
6 | PT Egis International Indonesia | LULUS |
7 | PT Surbana Jurong Indonesia | LULUS |
8 | KSO PT Anagata Dhia Karya Mandiri – PT Rayasurverindo Tirtasarana | LULUS |
9 | KSO PT Gamma Epsilon – PT Rayakonsult | LULUS |
10 | PT Kwarsa Hexagon | LULUS |
11 | PT Smec Denka Indonesia | LULUS |
12 | PT Arkonin Engineering Manggala Pratama | LULUS |
13 | PT Silicon Adilaras | LULUS |
14 | PT Mott MacDonald Indonesia | LULUS |
15 | KSO PT Arup Indonesia – PT Rayya Satu | LULUS |
16 | PT Gravia Lima Teknika | LULUS |
*Service Providers who are not listed in the table above are declared not to have passed the passing grade specified in the Prequalification Document
Next Stages
Service Providers who have passed will be designated as Panel members by obtaining an Indefinite Delivery Contract Offer where the Service Provider will later be invited to refer to the infrastructure sector that will be Procured as listed in the attachment.
Other provisions
This announcement was made based on the absolute policy of PT Sarana Multi Infrastruktur (Persero) and PT Sarana Multi Infrastruktur (Persero) is not required to provide any explanation regarding the results of this announcement.
Appendix
PPP Infrastructure Sector | Technical Consultant Panel |
---|---|
1. Drinking Water Supply System (SPAM) Sector |
|
2. Airport Sector |
|
3. Hospital Sector |
|
4. Public Street Lighting Sector |
- (Tidak Terbentuk Panel) |
5. Industrial Estate Sector |
|
6. Dam Sector |
|
7. Waste Processing and Final Processing Sector |
|
8. Flats Sector |
|
9. Land Transportation Sector |
|
10. Waste Treatment Sector |
|
11. Port Sector |
|
12. Education Sector |
|
13. Renewable Energy Sector |
|
Notice of Shortlisted Firms: Consultant Selection to Prepare the Detail Engineering Design (DED) for Tower Construction, Culinary and Souvenir Center of Palopo City, South Sulawesi
Date | : | 05 October 2021 - 05 October 2021 |
Status | : | Close/Tutup |
Request for Expressions of Interest: Consulting Services for Detail Engineering Design (DED) of Road Improvement and Bridge Construction Project in Kepahiang Regency, Bengkulu Province
Date | : | 02 January 2019 - 21 January 2019 |
Status | : | Close/Tutup |
Request for Expressions of Interest: Consulting Services to Prepare the Detail Engineering Design (DED) for Tower Construction, Culinary and Souvenir Center of Palopo City, South Sulawesi
Date | : | 05 October 2021 - 05 October 2021 |
Status | : | Close/Tutup |